Tuesday, June 21, 2016

Hard at Work


The last few months have been spent getting ready for little Peanut's arrival. Cal and Peanut are going to share a room, so I had the bright idea to change up the décor and overall theme of the room. We love the safari theme the room had, but I wanted to make changes and give Callen more of a big boy room feel. Because of spacing in the room, we knew we needed to have a loft bed for Cal to sleep in and put the crib underneath the loft to maximize space and efficiency in the room. We enlisted the talents of Oupa for the bed building, and we got to work putting in a new closet system and painting the room. Each project took at least 2 weeks longer than I was expecting it would just because of living in an old house!! The existing closet was a mess. Doug had to remove boards, patch the walls, and prime and paint before we could install the new closet system. For the rest of the room, we ended up having to sand the walls, prime over the existing color to make the color grey we chose look good, and paint the walls and trim how we wanted them. It took us over two months to complete all these projects, but we are SOOO happy with the end result.

Closet before

Nice big hole leading to one of master bedroom closets!

Callen helping with spackling

Primed and ready for closet install

Finished closet!
Peeling the stick-ons off the wall



Sanding walls and choosing paint colors (we went with the one on the far left)

Callen overcoming his fear of the Shop Vac to help clean at the end of each day!

Patiently waiting for mom and dad to play with him!

Taping!

Painting!
The grey color going on 2/3 of the room

Accent wall in preparation for painting

Dark grey of accent wall

Finished project except for outline of white 'V' will be either yellow or pink stripe depending on gender of Peanut!

Another view of rom with single paint color
My big kid bed is here and I can touch the ceiling with my head!

Climbing the ladder...over and over! The crib will be below the loft with enough head clearance for us to lift Peanut in and out of crib without any problem.

This is awesome up here!

Night one was a success!
A big thank you to Callen's Oupa for all his crafty skills in building this bed for Callen. It was a HUGE undertaking (we may never know the extent and amount of curse words spoken to us under his breath!), but it was so worth it to see the joy and happiness Cal had the first time he climbed in the bed. He still loves to get up there and hang out each night. Our next plan is to build a little pulley system with a basket so Cal can raise and lower books, toys, etc. in and out of his bed. He can't safely carry anything up and down the ladder, so he needs a way to get things out of the bed...without throwing them! It has been a crazy few months with house projects, but we are finally slowing down and taking time to relax and enjoy our last few days as a family of three.

1 comment: